With Western Power undergoing upgrades to the North Fremantle Substation, Mainswest was contracted to assist in the scope of open excavation and installation of 630mm 11 kV XLPE Cable, 240mm 11kV XLPE Cable and HD Conduit to allow Western Power to connect the existing network into the new switchroom.
The FMG Site T155 Port Expansion Project was a project that delivered great opportunities of FMG along the Port Expansion in Port Hedland, which also delivered an awesome feat and a great opportunity for Mainswest which we are grateful to be invited by ECM to be a part of this project.
Elizabeth Quay (formerly) Perth Waterfront is a Project that will return the city's focus to the iconic swan river and enhance Perthshire reputation as one of the most liveable cities in the world.
Mainswest has been involved with numerous stages in Brighton Estate since the very first project commenced back in 2000.
After installing all the high voltage cabling within the first stage of this university project we were fortunate to be invited back to site for Downer EDI to work as partners in finalising the 22kv / 11kv transfer substation project.
With Western Power undergoing upgrades to the North Fremantle Substation, Mainswest was contracted to assist in the scope of open excavation and installation of 630mm 11 kV XLPE Cable, 240mm 11kV XLPE Cable and HD Conduit to allow Western Power to connect the existing network into the new switchroom.
With Western Power undergoing upgrades to the North Fremantle Substation, Mainswest was contracted to assist in the scope of open excavation and installation of 630mm 11 kV XLPE Cable, 240mm 11kV XLPE Cable and HD Conduit to allow Western Power to connect the existing network into the new switchroom.







